
With pride of place on Kowloon’s water front at Hung Hum Bay, the 5-star luxury Kerry Hotel is an urban lifestyle resort with 546 guestrooms offering guests unique dining concepts, extraordinary spaces and spectacular harbor views.
Krueger provided the MVAC Installation including:
- Heat Rejection System – Indirect seawater cooling
- Central Chiller Plant – Centrifugal type water cooled chillers
- Central Heating Plant – Heat pumps, town gas condensing boiler and electric boiler
- Mechanical Ventilation System including the kitchen exhaust with electrostatic precipitators, smoke and staircase pressurization systems
Client | Shangri-La Group |
Architect | Rocco Design Architects Ltd. |
E&M Consultant | Parson Brinckerhoff | Contract Value | HK$130M |
Scope of Work | MVAC Installation |


